The Ram- and injection head is used in conjunction with the G¼" ram injection lance in slightly sandy soils for the purpose of sealing or consolidation. An enormous advantage of the Ram- and injection head is the possibility of flushing in during the ram injection process. In this way, the exit holes do not become clogged with the fine sand.
Work process
Connect ram lance with ram and injection head
Mount Geka coupling
Position the ram lance
Connect water until it emerges from transverse holes
Drive ram lance to desired depth (depths up to 3 m)
Connect the injection connection to material delivery line
Inject
After the injection process, pull the ram lance with ram and injection head out of the ground and clean it. For short lengths, it is possible to pull the ram injection lances manually by the handle.
Aggiungi articolo al carrello
Aggiungi tutti gli articoli selezionati al carrello
Rimuovere l'articolo dal carrello
Lista di controllo
Lista di controllo
Articolo non disponibile Preordinazione possibile
Articolo in basso quantità in stock
Articolo in sufficiente quantità in stock
Articolo in entrata
L'articolo è incluso in un'azione in corso
verso l'alto
ACCEDI AL PORTALE DEL RIVENDITORE
Accedi al portale dei rivenditori DESOI con i tuoi dati di accesso. Usa il tuo indirizzo email e la password per questo.
Se hai dimenticato la tua password, per piacere clicca qui.